Meander Valley Dairy Development – Site Preparation

JLH Excavation & Cartage was engaged to undertake site preparation works for a large-scale dairy development in the Meander Valley, transforming undeveloped farmland into a full-scale commercial operation. Our scope of works included:

  • On-Farm Road Construction – Including a new crossover connection to the council main road.

  • Detailed Site Preparation – Pad construction for key infrastructure, including precision trimming of the 1 megalitre water tank pad to within 5mm.

  • On-Farm Drainage – Installed to ensure effective water management across the site.

  • Cow Lane Installation – Constructed using JLH’s specialised cow lane shale, sourced from our Golden Valley Quarry. This clay-based product provides a durable surface that remains soft on cows’ feet.

  • Underpass Construction – Inlet and outlet preparation along with installation of a box culvert system to create a safe and functional underpass beneath the council road.

This project highlights JLH’s expertise in delivering high-quality, large-scale agricultural site preparation, ensuring efficiency, precision, and durability to support the establishment of a modern commercial dairy operation.

Previous
Previous

United Service Station Elizabeth Town

Next
Next

Road Construction (Smithton)